For Whom the Road Tolls: Part II

August 11, 2021 | 5 Min Read
  • SHARE

What is it about the market and regulatory structure in the U.S. that makes infrastructure spending ostensibly more difficult than in other global economies?

To start, the Federalist approach of the United States results, by design, in a decentralized collection of state governments with weaker federal authority than other sovereign states. The federal government’s largest dedicated infrastructure spending vehicle is the Highway Trust Fund (HTF), which was established in 1956 to fund the nation’s interstate highway system. The HTF is funded through a federal fuel tax of 18.4 cents per gallon on gasoline and 24.4 cents per gallon on fuel. In a way, this is one of the early examples of a federal use tax applied to infrastructure assets. Raising taxes to fund further infrastructure buildout or improvement has never been a popular option.  As a result, the fuel taxes that support the HTF have not changed in more than 20 years and some analysts believe that the HTF could be insolvent as early as 2022.  

Although the HTF still provides a significant funding source, state and local governments supply  approximately 75% of the funding for most U.S. infrastructure spending.  

Federal vs. State and Local Infrastructure Spending

State governments accomplish this primarily through the issuance of tax-advantaged municipal bonds or through budget reconciliation measures. As shown, state and local government spending on infrastructure has also flatlined in recent years.  

With public sources of infrastructure capital seemingly tapped, this should create a healthy environment for private capital to help fill the gap. The typical models for public-private partnerships (PPPs) come along with a healthy number of commercial, regulatory and political risks. The table below summarizes some of the typical transaction arrangements we see within PPPs.  

hamilton-lane

These transaction arrangements seem straightforward enough: Different parties assume different risks in exchange for different participation rights in the economics of the project. So, there are probably lots of PPP-structured projects all over the U.S., right? Wrong. In fact, there’s a real disconnect between the need for capital and the capital that actually gets deployed in these projects.  Here are a few reasons why:

  1. The long lead times and high pursuit costs don’t coincide with the timelines or target IRRs of most private infrastructure funds – long-dated projects with big J-curves result in lower IRRs.
  2. The political environment in the U.S. results in significant regulatory uncertainty and concerns that those regulations may change over the holding period, especially as they relate to pricing or revenue mechanisms in the project.
  3. There is concern over who bears the risk of utilization. Private investors generally want to be paid based on capacity or availability, and public entities often want asset owners to be compensated only from actual volumes or asset utilization, without guaranteed contract payments.
  4. Related to the above, control over pricing, especially when the price for the service is borne directly by the public users, can often be a source of disagreement.
  5. An inability to agree on governance and liability issues can also derail these projects, including concerns over transfer rights related to exit and monetization, labor interests, cost overruns and environmental liabilities.
  6. Headline risk. Both public and private investors face significant scrutiny on how projects are awarded, executed and managed.

As you can see, these hurdles are real and they are difficult to overcome. That said, we are seeing some PPPs get done, but they are generally limited to semi-autonomous entities like universities or port authorities that have greater latitude to structure private capital investments without the same hurdles faced by state or local municipal governments.   

In contrast to the U.S. market, Europe and other parts of the world have successfully employed models that more effectively integrate private capital asset ownership with public funding or regulatory oversight.

The Regulated Asset Base (“RAB”) model is a system of investment incentives and price control mainly used in Europe to support infrastructure needs. This model essentially grants an asset owner/developer with a monopoly position to provide a service, while price controls and efficiency targets are maintained by the regulator. The regulator determines the types of capex that can be included in the asset base, along with a rate of return that can be earned on that asset base by the private owner. The rate of return, however, is often based on the regulator’s determination of efficient service delivery. This model has incentivized the development of large-scale, complex projects and encouraged their efficient operation by private owners. While regulated utilities in the U.S. employ a similar model for electricity, other countries have utilized the RAB model to both modernize and develop a broader spectrum of essential infrastructure, including water distribution, gas networks, electricity generation, airports and road and rail transport.

In the renewables sector, two common public-private funding mechanisms employed globally are Contracts-for-Difference (“CFD”) and Feed-in-Tariffs (“FIT”). CFDs are long-term (e.g., 15-year) contracts between the energy generator and the government, whereby a ‘strike price’ is set via a reverse auction during which generators bid to sell power. The payment profile is more bilateral than Feed-in-Tariffs by introducing a clawback mechanism that results in a payment to the government when the strike price is below the market price. This seeks to make pricing fairer to the electricity consumer.

Feed-in-Tariffs are a form of revenue subsidy whereby a government entity agrees to underwrite a floor price, typically above market levels, over a long-term contract of 15-20 years. By underwriting electricity tariffs at above market levels, the government can encourage the development of renewable energy that was early in the maturation lifecycle when build and production costs were high. However, the dramatic decline in production costs (e.g., the levelized cost of solar PV has declined by 90% since 2009) has led to several governments (see: Germany, Spain) winding down their existing FIT regimes while others have taken more draconian measures (see: France) to cut tariffs on contracts where the government now feels that the rates were set too high.

Overall, FIT deployment is broadly in decline across Europe; however, it continues to form an important element of renewable energy roll-out in developed Asian countries, such as Japan, and other markets where renewable generation is much less mature, and governments are trying to encourage private investors to add incremental capacity. Where do we go from here? In Part III of this series, we’ll break down the $1 trillion plan proposed by the Biden administration in the U.S., an ambitious and unprecedented spending package which seeks to address some of these hurdles.



Disclosures

This presentation is not an offer to sell, or a solicitation of any offer to buy, any security or to enter into any agreement with Hamilton Lane or any of its affiliates. Any such offering will be made only at your request. We do not intend that any public offering will be made by us at any time with respect to any potential transaction discussed in this presentation. Any offering or potential transaction will be made pursuant to separate documentation negotiated between us, which will supersede entirely the information contained herein.  

Any tables, graphs or charts relating to past performance included in this presentation are intended only to illustrate the performance of the indices, composites, specific accounts or funds referred to for the historical periods shown. Such tables, graphs and charts are not intended to predict future performance and should not be used as the basis for an investment decision.  

The information herein is not intended to provide, and should not be relied upon for, accounting, legal or tax advice, or investment recommendations. You should consult your accounting, legal, tax or other advisors about the matters discussed herein.  

As of August 11, 2021  

Recent Content

Video | 8 Min Watch

SuperReturn: Infrastructure & Private Credit Opportunities

What is the current opportunity set for infrastructure and private credit investing? Hear insights from Head of SEA Kerrine Koh.

Watch the Video
Insights | 3 Min Read

One Man’s Trash | Evaluating Environmental Infrastructure Assets

We've noticed an interesting trend over the last five years in our infrastructure deal funnel. Among the main subsectors of infrastructure that we track, environmental is the fastest-growing category by number of deals. Learn about the three characteristics that make them attractive in today's uncertain economic environment.

Read the Research Article
Insights | 3 Min Read

How High Is Too High | Are Infrastructure Valuations Grounded in Reality?

Headline valuations associated with infrastructure transactions have, for years, been subject to mockery, skepticism or a more subtle roll of the eyes, with airports, data centers and towers considered usual suspects. So, what do we make of infrastructure valuations in today’s environment?

Read the Research Article

We use cookies to improve user experience, and analyze web traffic. For those reasons, we may share your site usage with our analytics partners.

Learn More